Start With The Product And The Complete Production Route

The starting point for a concrete brick making machine price is the brick you intend to sell. Its dimensions, shape, finish and required daily quantity determine the mold and the production arrangement. A quotation based on “bricks per hour” is incomplete unless it identifies the product used for that figure and the equipment included around the forming machine.

YG’s QT4-15C catalog configuration provides a useful basis for discussing a stationary concrete-block line. This page connects its documented specifications to mold choice, material supply, pallet movement and curing space. It does not publish an unverified fixed selling price. The current offer must identify the selected configuration and line boundary; equipment shown in an illustration should not be assumed to be included.

Which Brick Should The Concrete Brick Making Machine Price Cover?

Choose the main product before comparing production figures. A hollow masonry block, a solid brick and a colored paver occupy the mold differently and may need different forming cycles. Ask for the actual drawing, number of pieces per mold and required finish. The general concrete brick making machine range is a starting point, but the quotation should name the mold supplied with this configuration.

YG’s QT4-15C catalog lists the following theoretical production examples. These are different products made with different molds, not simultaneous outputs from one installation. Confirm the proposed mold against your local product dimensions and acceptance requirements. Do not substitute a superficially similar size when calculating the number of saleable units.

Catalog ProductDimensionsPieces Per MoldMolding CycleTheoretical Hourly Output
Colored Brick200 × 100 × 60 mm1618–23 s2504–3200 pieces
Paving Brick200 × 160 × 60 mm1018–23 s1565–2000 pieces
Solid Brick240 × 115 × 53 mm2815–17 s5930–6720 pieces
Hollow Block390 × 190 × 190 mm415–20 s720–960 pieces

The hollow-block example makes the comparison clear: four pieces every 20 seconds corresponds to 720 pieces per uninterrupted hour. It does not allow for mixing delays, pallet shortages, changeovers, rejects or maintenance. Price a line around an achievable production plan, not around the best cycle multiplied by an entire shift without interruption.

Send the brick drawing, required finish and planned daily quantities for each product. YG can identify the mold scope and separate your main production requirement from occasional variants.

MATCH MY BRICK AND MOLD REQUIREMENTS

Gray Hollow Concrete Blocks Stacked On A Wooden Pallet
Hollow Block Dimensions Determine The Required Mold
Rectangular Concrete Pavers With Red Faces And Gray Bodies On A Pallet
Colored Pavers Require Their Own Product And Finish Specification

What Defines The QT4-15C Core Machine Configuration?

The following technical data belongs to the QT4-15C entry in YG’s product catalog. Keep the model suffix when comparing offers; a similar model name from another configuration is not evidence of identical power, dimensions or accessories. The overall-power entry is the catalog machine figure, not an independently calculated total for every upstream and downstream unit.

QT4-15C Technical ParameterCatalog Value
Overall Dimensions7310 × 2500 × 2810 mm
Rated Pressure16 MPa
Main Vibration FormPlatform Vibration
Vibration Frequency2800–5100 per Minute
Pallet Size1020 × 570 mm
General Molding Cycle15–20 s
Exciting Force55 kN
Overall Power27.5 kW

Use these values to discuss the machine envelope, pallet compatibility and site services. They do not establish the entire factory footprint or final electrical design. Request the confirmed installation drawing and supply specification for the quoted line. Clearance for maintenance, mold handling and movement must be added to the machinery’s physical dimensions.

A concrete brick making machine price should also state the control arrangement and the units connected to it. Adding equipment is not simply a matter of adding its purchase amount: transfer heights, cycle timing and control interfaces must work together. Confirm these interfaces before buying auxiliary machines independently.

Blue And Yellow Block Forming Machine With An Empty Roller Conveyor
Machine Dimensions Do Not Include Every Site Clearance

Which Line Equipment Should Be Included Rather Than Assumed?

Batching, Mixing And Feeding

The forming machine needs a consistent supply of material appropriate to the selected brick. Identify the aggregate storage, dosing, cement handling, water measurement, mixer and conveyor arrangement. A concrete batching plant may provide relevant material-control functions, but its capacity and discharge arrangement still need to match the block-line cycle. Avoid buying excess mixing capacity while leaving the transfer route unresolved.

For colored products, clarify whether a separate face-material arrangement is required and included. Ask the supplier to distinguish the main mix from the surface-layer equipment rather than treating a colored sample photograph as proof of the quoted scope. Material recipes and product performance need trial validation; this article does not prescribe a universal cement or pigment proportion.

Pallets, Green Blocks And Return Movement

Freshly formed blocks must move without damage and without preventing the next cycle. Define who supplies production pallets, transfer equipment, storage supports and any stacking or cubing functions. Pallet dimensions alone do not confirm thickness, material or condition requirements. Request the compatible pallet specification and a quantity proposal tied to the production and curing arrangement.

Follow a pallet through the complete route and back to the machine. A low concrete brick making machine price can conceal a line that requires more manual handling than the buyer expected. Conversely, an elaborate handling system is not automatically justified for every product mix. Compare the labor and movement actually required by each proposed arrangement.

Share a layout sketch and list the mixer, batching and handling equipment you already own. YG can define the missing interfaces and price only the additional equipment needed for the proposed line.

DEFINE MY PRODUCTION LINE SCOPE

Blue Aggregate Bins Connected By A Guarded Inclined Conveyor To A Mixer
Coordinate Material Supply With The Forming Cycle
Two Empty Flat Blue Production Boards Resting On A Roller Conveyor
Specify Pallet Compatibility And The Return Route

Can The Site Support The Planned Output After Forming?

Curing and storage deserve space in the plan before equipment is ordered. Establish how fresh products will be protected, moved and held under the proposed production method. The necessary holding time depends on the material and process; do not assume a universal overnight release. Finished-product storage and dispatch need a separate route so incoming aggregates and outgoing blocks do not compete for the same access.

Draw the flow from materials to mixing, forming, green-product storage and finished dispatch. Mark service access, safe walkways and handling clearances. The catalog machine length is not a factory-layout allowance. An installation that fits physically can still lose output if operators repeatedly stop to clear pallets or make space for finished products.

The concrete brick making machine price should therefore be reviewed with the site plan, not before it. Include foundations, site services and the equipment needed to move materials in the project budget. Ask for the supplier’s confirmed installation requirements rather than estimating civil or electrical work from product photographs.

Banded Stacks Of Finished Concrete Blocks Stored Under A Factory Roof
Reserve Finished Storage And Dispatch Space Separately

How Do Mold Changes And Acceptance Affect The Quotation?

List every initial mold separately and distinguish future options. Different brick shapes may require matching tamper components, adjustment and a defined change procedure. Confirm the handling method and access for heavy mold parts. Do not promise rapid changeover from a catalog image; ask what the procedure involves for the actual configuration and available lifting equipment.

Agree on representative production trials and the evidence used to assess the finished product. Dimensions, appearance, density or strength requirements should follow the buyer’s applicable specification and testing arrangements. A fast molding demonstration alone does not prove saleable output. Record the mix, mold, cycle and curing conditions associated with any accepted sample.

For a current concrete brick making machine price, request an itemized offer identifying the QT4-15C configuration, molds, pallets, auxiliary units, installation support and delivery responsibilities. Check currency and validity on the quotation. Supplier purchasing documents or historical prices for a different model should not be treated as a current YG selling offer.

Send your initial mold list, product acceptance requirements and destination. YG can prepare a configuration-specific proposal with optional items separated from the essential line.

REQUEST MY QT4-15C LINE PROPOSAL

Heavy Steel Concrete Block Mold And Tamper Components Resting On Wooden Supports
Identify Each Mold And Its Matching Components In The Quote

QT4-15C Purchase Questions

Does One Mold Produce All Four Catalog Products?

No. The examples represent different molds and products. Specify the drawings and quantities of the molds required for your initial order.

Is The Listed Hourly Output A Guaranteed Shift Total?

No. It is theoretical cycle-based output. Material supply, handling, changeovers, rejects and stops affect actual accepted production.

Does 27.5 kW Cover Every Machine In The Plant?

Do not assume so. Obtain the complete connected-load and supply requirements for the actual equipment included in the quotation.

Are Pallets And Curing Equipment Automatically Included?

Their specifications and quantities must be stated. The quoted line boundary should identify supplied items and buyer-provided facilities explicitly.

A useful concrete brick making machine price follows a defined product and production route. Start with brick drawings and daily demand, then confirm the QT4-15C configuration, mold set, material supply, pallet circulation and curing space. These decisions let YG prepare a comparable offer without hiding the cost of the equipment and site work around the main machine.

    Request A Quote